Material Takeoff (MTO) Services

Translate abstract construction work items into physical procurement bills. Know exactly how many cement bags, steel rebar tonnes, truckloads of sand, and boxes of tiles your project requires.

Generate Material Bill WhatsApp Inquiries

Procurement-Driven Material Breakdowns

Ordering materials on rule-of-thumb leads to costly on-site wastage, double-handling, or critical project stoppages. TEC generates exact Bill of Materials (BOM) linked with standard dry-volume conversion factors and reasonable wastage factors.

CEMENT PROCUREMENT

Cement Grade & Demand Breakdown (Bags)

Exact cement consumption derived using standard dry-volume conversion factor 1.54, segregated into OPC 53 and PPC.

Precision Standard: Exact Bag Indent
Deliverable Format: Procurement Schedule
Compliance Code: IS 456 & CPWD Constants
  • Dry volume multiplier 1.54 applied for wet concrete
  • OPC 53 allocated for structural RCC frame
  • PPC allocated for blockwork mortar and plastering
Cement Bags = [Dry Vol × (Cement Part / Ratio Sum) × 1440 kg/cum] / 50 kg
REBAR INDENT

Steel Rebar Procurement Schedule (MT)

Diameter-wise tonnage indents specifying 8mm, 10mm, 12mm, 16mm, 20mm, 25mm, and 32mm with rolling margin calibrations.

Precision Standard: Diameter-Wise Precision
Deliverable Format: Purchase Order Ready
Compliance Code: IS 1786 (Fe500D / Fe550D)
  • Primary mill rebar indents (Tata, JSW, SAIL)
  • Commercial rolling margin factor (+2.5%) applied
  • Procurement delivery lot phase planning
Rebar Indent MT = Theoretical BBS Weight × 1.03 (Lapping & Scrap Allowance)
AGGREGATE & BLOCKS

Aggregates, Sand & Block Counts (CFT / Nos)

M-Sand Zone II for concrete, P-Sand for plastering, 20mm/10mm granite aggregate, and AAC/solid block units with breakage allowances.

Precision Standard: Quarry Order Ready
Deliverable Format: Material Master Indent
Compliance Code: IS 383 & IS 2185
  • M-Sand & P-Sand demand separated by grading
  • Coarse aggregate 20mm:10mm blended at 60:40 ratio
  • Block units calculated with 2% transit breakage allowance
Block Units = [Net Wall Volume / Block Gross Dimensions] × 1.02
DIRECT CLIENT VAULT

Inspect Real Civil Estimation Deliverable Models

Want to see real unpriced BOQs, unit rate analysis spreadsheets, or tender normalization matrices? Open our unlocked models vault directly on your mobile or desktop.

Open Models Vault (or Scan QR) →
Need an Estimate for This Service?
Send your architectural or structural plans for an audit-ready proposal within 2–4 hours.