India's Trusted Estimation Partner  •  IS 1200 Compliant  •  Accurate BOQs  •  Bangalore & PAN India
Home / Services / BOQ Preparation
Standard Method of Measurement

BOQ Preparation Services (IS 1200)

Prepare organized, legally defensible Bills of Quantities that make contractor pricing transparent, bid comparisons straightforward, and variation disputes virtually impossible.

Request BOQ Drafting Discuss on WhatsApp

The Anatomy of a Professional TEC BOQ

A Bill of Quantities (BOQ) serves as the legal and commercial cornerstone of a construction contract. Poorly drafted BOQs with ambiguous descriptions create scope disputes, contractor claims, and budget blowouts. TEC drafts itemized, unambiguous BOQs following Indian Standard IS 1200 codes.

IS 1200 METHODOLOGY

Unambiguous Item Descriptions

Every item details exact material grades, concrete mix ratios, lead and lift allowances, curing SLAs, and approved manufacturer schedules.

Precision Standard: Zero Ambiguity
Deliverable Format: Active Math Excel (.xlsx)
Compliance Code: IS 1200 Part 1-28
  • Precise mix design ratios (OPC 53, Fe500D TMT)
  • Lead & lift allowances computed per kilometer
  • Explicit inclusion/exclusion boundary definitions
Item 02.04: RCC M25 Concrete (cum) = L × B × D [Deduct: Openings > 0.1 sqm]
CPWD DSR UNITS

Standardized SMM Units & Measurements

Measurement units strictly adhere to national SMM codes (cum, sqm, rmt, MT, Nos) ensuring all tender bidders price identical commercial scopes.

Precision Standard: ±0.5% Quantity Limit
Deliverable Format: Print-Ready PDF + XLS
Compliance Code: Standard Method of Measurement
  • Floor-by-floor concrete and formwork breakdown
  • Diameter-wise structural steel rebar registers
  • Surface deductions compliant with IS 1200 Part 12
Steel BBS Tonnage (MT) = Σ(Dia² / 162.28 × Length × Nos) / 1000
DUAL DOSSIERS

Priced & Unpriced Dual Packages

Unpriced BOQs for competitive contractor tender pricing, paired with confidential priced benchmark models for client financial benchmarking.

Precision Standard: 100% Rate Defense
Deliverable Format: Confidential Audit Format
Compliance Code: FIDIC & CPWD Guidelines
  • Unpriced bidding schedules for contractor circulation
  • Benchmark rate build-up with local material tariffs
  • Front-loading detection formula active in workbook
Contractor Variance % = (Bidder Quote - TEC Benchmark) / Benchmark × 100

Sample BOQ Trade Division

Trade Division Key Inclusions Measurement Standard
Division 01: Substructure Excavation, Shoring, Anti-termite, PCC 1:4:8, Isolated / Raft RCC Footings IS 1200 Part 1 & Part 2
Division 02: Superstructure Frame RCC M25/M30 Columns, Beams, Slabs, Shuttering/Staging, Fe500D Reinforcement IS 1200 Part 2 & Part 5
Division 03: Masonry & Plaster Solid Blockwork 150mm/100mm, Internal CM 1:4 Plastering, External Double-coat Sand-faced IS 1200 Part 3 & Part 12
Division 04: Architectural Finishes Vitrified Tile Flooring, Granite Steps, Skirting, Waterproofing, Primer & Premium Emulsion IS 1200 Part 11 & Part 13
DIRECT CLIENT VAULT

Inspect Real Civil Estimation Deliverable Models

Want to see real unpriced BOQs, unit rate analysis spreadsheets, or tender normalization matrices? Open our unlocked models vault directly on your mobile or desktop.

Open Models Vault (or Scan QR) →
Need an Estimate for This Service?
Send your architectural or structural plans for an audit-ready proposal within 2–4 hours.
Request an Estimate → Explore Sample Models
WhatsApp Chat AskTEC AI Assistant